Description of services as
outlined in the Architect's Contract
Schematic Design and Design
Development Phases
Planning in this phase will usually consist of
meetings between the architect and the owner.
These meetings consist of discussions and
presentation of sketches of the plans in
progress.
A master plan is prepared showing the first
phase to be undertaken. This enables the
architect to completely develop the schematic
design of the first phase, which will consist of
a scale floor and site plan, showing space
layout and estimated cost. Cost estimates at
this stage are usually based on comparative and
historic data and will be refined as more
information about the project is developed.
After the schematic design has been approved by
the client, the architect will develop the plan
in more detail, showing elevations (drawings
which show internal and external design in
addition to the floor plan). For the services of
schematic design and design development, 20% of
the fee will be payable. A more refined estimate
of costs will be furnished at the conclusion of
these first two phases.
Construction Documents
These will be highly detailed working drawings
and specifications which include architectural,
structural, mechanical and electrical elements
required. The architect will utilize engineers
to complete these documents which will be
provided to contractors for bids. An additional
60% to 65% of the fee will be due at completion
of construction documents. If the completion of
these documents takes more than a month then
billing would be a percentage of progress.
Bidding Phase
The client may choose from several methods of
obtaining bids, or they may pre-select a
contractor to negotiate a contract. The
architect will assist the owner in deciding
which route is the best for them. The client
should confer with the architect in selecting
possible bidders.
The architect will issue plans to general
contract bidders as selected or to contractors
who request them. Included with the documents
are instructions to bidders and bid proposal
forms. To be considered, bids must be submitted
on that form. The instructions to bidders
usually states the time and place bids will be
received. Bids are usually received at a place
selected by the client and architect, such as
the client's place of business or the
architect's office. The time selected is usually
mid-afternoon (eg: 3:00 P.M.). Bids are received
at that pre-set time, opened, and read aloud.
Contractors are subsequently thanked and
dismissed. Bids will then be discussed with the
client. The contractors are required to furnish
a 5% bid bond, guaranteeing their bids for 30
days. This gives the client and architect some
time to evaluate bids before awarding the
contract.
The successful bidder will be required to
provide a Performance or Completion Bond. The
performance bond is issued by a surety company
that guarantees the project will be finished, if
for some reason the contractor cannot complete
it.
Administration of the
Construction Contract
During this phase the architect will serve as
the owner's agent. This will include the
architect's advisory services in awarding the
bid to a contractor, periodic observation of the
construction, review of payment applications
from the contractor as construction proceeds,
review of submittals from the contractor, final
punch lists and certification that the job was
completed according to plans. The final 15-20%
of the fee will be paid in equal monthly
installments during construction.
Additional Services
Additional services (not included in the basic
contract) can be provided by the architect
including interior decoration and selection of
furnishings. Landscape architects and civil
engineers may be necessary for proper site
development. Other costs not included in the
architectural services are site survey and soil
tests. |